BR100 Increased By (1.94%)
BR30 Increased By (2.03%)
KSE100 Increased By (1.96%)
KSE30 Increased By (1.93%)
AGHA 6.18 Increased By ▲ 0.06 (0.98%)
BECO 4.26 Increased By ▲ 0.10 (2.4%)
BML 61.31 Decreased By ▼ -1.42 (-2.26%)
BOP 31.60 Increased By ▲ 0.70 (2.27%)
CNERGY 11.99 Increased By ▲ 0.02 (0.17%)
CSIL 5.66 Increased By ▲ 0.24 (4.43%)
FCCL 58.49 Increased By ▲ 1.71 (3.01%)
FFL 13.49 Increased By ▲ 0.15 (1.12%)
FNEL 1.17 Increased By ▲ 0.02 (1.74%)
KEL 6.15 Increased By ▲ 0.15 (2.5%)
KOSM 5.67 Increased By ▲ 0.19 (3.47%)
LOTCHEM 24.85 Increased By ▲ 0.48 (1.97%)
MLCF 101.90 Increased By ▲ 4.41 (4.52%)
NBP 180.98 Increased By ▲ 6.48 (3.71%)
NCPL 50.10 Increased By ▲ 1.63 (3.36%)
NPL 52.99 Increased By ▲ 2.76 (5.49%)
OGDC 315.25 Increased By ▲ 4.78 (1.54%)
PACE 9.20 Increased By ▲ 0.15 (1.66%)
PAEL 34.00 Increased By ▲ 0.93 (2.81%)
PIBTL 13.44 Increased By ▲ 0.29 (2.21%)
PPL 220.99 Increased By ▲ 3.82 (1.76%)
PRL 84.25 Decreased By ▼ -1.41 (-1.65%)
PTC 48.25 Increased By ▲ 2.06 (4.46%)
SSGC 22.85 Decreased By ▼ -0.47 (-2.02%)
TBL 9.27 Increased By ▲ 0.25 (2.77%)
TELE 7.05 Increased By ▲ 0.32 (4.75%)
TPL 25.60 Decreased By ▼ -0.50 (-1.92%)
TPLP 13.22 Increased By ▲ 0.55 (4.34%)
TREET 24.90 Increased By ▲ 1.10 (4.62%)
TRG 53.80 Increased By ▲ 0.63 (1.18%)

Tianqi Lithium Corp, one of the world's biggest lithium producers, said on Sunday it had postponed commissioning of the first phase of its flagship Australian processing plant due to rising liquidity problems after the coronavirus outbreak.
The Chinese firm started production from what was slated to be the world's largest facility for lithium hydroxide, used in batteries for electric vehicles, in September 2019, with the ramp-up of the 24,000 tonnes per year first phase in Kwinana, Western Australia, expected to take between 12 and 18 months.
But Tianqi, which last month admitted having difficulty paying back loans taken out for the $4.1 billion purchase of a 23.8% stake in Chilean miner SQM in 2018, said its "tight liquidity situation" had intensified since the start of 2020 due to the virus outbreak.
The commissioning of the first phase of the lithium hydroxide plant had therefore been postponed, Tianqi said in a filing to the Shenzhen Stock Exchange in response to questions from the securities regulator in its home province of Sichuan, without providing a further timeline.
The Kwinana plant is one of a number of metals projects around the world to be impacted by the coronavirus, which has infected more than 305,000 people globally and has seen both miners and smelters reduce operations.

Copyright Reuters, 2020

Comments

Comments are closed for this article.