BR100 Decreased By (-0.75%)
BR30 Decreased By (-0.82%)
KSE100 Decreased By (-0.68%)
KSE30 Decreased By (-0.8%)
AGHA 6.52 Decreased By ▼ -0.17 (-2.54%)
BECO 4.32 Decreased By ▼ -0.05 (-1.14%)
BML 57.04 Decreased By ▼ -2.19 (-3.7%)
BOP 29.25 Decreased By ▼ -0.55 (-1.85%)
CNERGY 12.39 Decreased By ▼ -0.34 (-2.67%)
CSIL 5.14 Decreased By ▼ -0.03 (-0.58%)
FCCL 52.07 Decreased By ▼ -0.09 (-0.17%)
FFL 14.01 Increased By ▲ 0.01 (0.07%)
FNEL 1.16 Decreased By ▼ -0.03 (-2.52%)
KEL 5.96 Decreased By ▼ -0.08 (-1.32%)
KOSM 5.38 Decreased By ▼ -0.24 (-4.27%)
LOTCHEM 26.60 Increased By ▲ 1.01 (3.95%)
MLCF 90.95 Increased By ▲ 0.05 (0.06%)
NBP 160.74 Decreased By ▼ -1.27 (-0.78%)
NCPL 51.23 Decreased By ▼ -1.49 (-2.83%)
NPL 55.99 Increased By ▲ 0.25 (0.45%)
OGDC 308.66 Decreased By ▼ -7.25 (-2.29%)
PACE 9.57 Decreased By ▼ -0.15 (-1.54%)
PAEL 33.73 Decreased By ▼ -0.33 (-0.97%)
PIBTL 13.58 Increased By ▲ 0.07 (0.52%)
PPL 218.35 Decreased By ▼ -1.94 (-0.88%)
PRL 91.12 Decreased By ▼ -3.20 (-3.39%)
PTC 60.09 Decreased By ▼ -0.15 (-0.25%)
SSGC 23.04 Decreased By ▼ -0.13 (-0.56%)
TBL 8.96 Decreased By ▼ -0.26 (-2.82%)
TELE 7.17 Decreased By ▼ -0.11 (-1.51%)
TPL 19.41 Decreased By ▼ -0.65 (-3.24%)
TPLP 11.80 Decreased By ▼ -0.10 (-0.84%)
TREET 22.25 Decreased By ▼ -0.82 (-3.55%)
TRG 55.22 Decreased By ▼ -1.27 (-2.25%)
World

German nuclear plant outages

Published Updated

imageFRANKFURT: The following table lists planned outages at German nuclear power plants.

It gives dates for previous outages, plants returning online and planned shutdowns. Sources are the Web pages offered by RWE and EnBW, and, for E.ON installations, the EEX exchange's transparency website.

The maximum national capacity of 12,696 MW can be utilised.

Germany took the axe to the bulk of its nuclear capacity in the summer of 2011, switching off the seven oldest blocks plus Vattenfall's Kruemmel permanently after the Japan nuclear crisis earlier that year raised safety concerns.

German policymakers agreed to leave the 8,821 MW represented by the eight blocks offline when a three-month moratorium expired at the end of June 2011.

Before the Fukushima crisis, German (gross) nuclear capacity had amounted to 21,500 MW.

The policy switch in 2011 reversed longer nuclear life cycles that had been granted to the remaining nuclear power stations in the autumn of 2010. It also sped up the timetable for closure of all remaining capacity by 2022.

Copyright Reuters, 2015

Comments

Comments are closed for this article.