BR100 Increased By (5%)
BR30 Increased By (5.87%)
KSE100 Increased By (4.23%)
KSE30 Increased By (4.7%)
AGHA 7.65 Increased By ▲ 0.25 (3.38%)
BECO 5.21 Increased By ▲ 0.15 (2.96%)
BML 58.29 Increased By ▲ 1.86 (3.3%)
BOP 34.61 Increased By ▲ 1.97 (6.04%)
CNERGY 10.76 Increased By ▲ 0.47 (4.57%)
CSIL 5.69 Increased By ▲ 0.33 (6.16%)
FCCL 56.47 Increased By ▲ 4.73 (9.14%)
FFL 16.85 Increased By ▲ 0.36 (2.18%)
FNEL 1.23 Increased By ▲ 0.02 (1.65%)
KEL 7.47 Increased By ▲ 0.33 (4.62%)
KOSM 6.18 Increased By ▲ 0.13 (2.15%)
LOTCHEM 27.68 Increased By ▲ 0.87 (3.25%)
MLCF 96.56 Increased By ▲ 8.39 (9.52%)
NBP 208.60 Increased By ▲ 15.42 (7.98%)
NCPL 58.13 Increased By ▲ 2.82 (5.1%)
NPL 67.61 Increased By ▲ 2.96 (4.58%)
OGDC 323.45 Increased By ▲ 13.07 (4.21%)
PACE 10.71 Increased By ▲ 0.33 (3.18%)
PAEL 43.37 Increased By ▲ 2.52 (6.17%)
PIBTL 16.80 Increased By ▲ 0.95 (5.99%)
PPL 224.67 Increased By ▲ 13.57 (6.43%)
PRL 55.51 Increased By ▲ 2.37 (4.46%)
PTC 71.07 Increased By ▲ 3.00 (4.41%)
SSGC 25.97 Increased By ▲ 1.12 (4.51%)
TBL 9.78 Increased By ▲ 0.28 (2.95%)
TELE 8.65 Increased By ▲ 0.36 (4.34%)
TPL 19.61 Increased By ▲ 1.32 (7.22%)
TPLP 13.18 Increased By ▲ 0.21 (1.62%)
TREET 22.67 Increased By ▲ 1.24 (5.79%)
TRG 60.05 Increased By ▲ 1.08 (1.83%)
Pakistan

World’s highest airport begins construction under CPEC

The airport, which will be built at the Pamir Plateau at an elevation of 4,500 meters, is part of the China Pakista
Published Updated
  • The airport, which will be built at the Pamir Plateau at an elevation of 4,500 meters, is part of the China Pakistan Economic Corridor (CPEC).

China has begun the construction of what would be the world's highest airport on completion, at its northwest Xinjiang Uygur Autonomous Region.

The airport, which will be built at the Pamir Plateau at an elevation of 4,500 meters, is part of the China Pakistan Economic Corridor (CPEC) and the Belt and Road Initiative (BRI).

As per Chinese media outlet CGTN, the airport will cost about $230 million, the airport runway will be measuring 3,800 meters long and 45 meters wide, and will have a terminal of 3,000 square meters and an apron with four stands, among other facilities.

The airport will be able to accommodate 160,000 passengers and 400 tons of cargoes annually.

As per building authorities, the airport upon completion is expected to bring a lot more tourists into Pamirs Plateau, noted for its natural beauty and unique Tajik culture, however, it remains inaccessible due to rough terrain.

The airport construction is expected to complete by the first half of 2022.

Comments

Comments are closed for this article.