BR100 Increased By (1.68%)
BR30 Increased By (2.44%)
KSE100 Increased By (1.48%)
KSE30 Increased By (1.55%)
AGHA 6.15 Increased By ▲ 0.12 (1.99%)
BECO 4.16 Increased By ▲ 0.30 (7.77%)
BML 60.40 Decreased By ▼ -0.60 (-0.98%)
BOP 29.22 Increased By ▲ 1.13 (4.02%)
CNERGY 11.92 Increased By ▲ 0.18 (1.53%)
CSIL 5.55 Increased By ▲ 0.25 (4.72%)
FCCL 56.40 Increased By ▲ 1.94 (3.56%)
FFL 13.02 Decreased By ▼ -0.05 (-0.38%)
FNEL 1.15 Increased By ▲ 0.04 (3.6%)
KEL 5.82 Increased By ▲ 0.19 (3.37%)
KOSM 5.59 Increased By ▲ 0.25 (4.68%)
LOTCHEM 24.09 Increased By ▲ 0.26 (1.09%)
MLCF 96.53 Increased By ▲ 3.55 (3.82%)
NBP 168.56 Increased By ▲ 5.36 (3.28%)
NCPL 48.00 Decreased By ▼ -0.27 (-0.56%)
NPL 50.20 Increased By ▲ 0.49 (0.99%)
OGDC 309.94 Increased By ▲ 6.31 (2.08%)
PACE 9.06 Increased By ▲ 0.09 (1%)
PAEL 32.30 Increased By ▲ 0.39 (1.22%)
PIBTL 13.06 Increased By ▲ 0.32 (2.51%)
PPL 217.40 Increased By ▲ 4.49 (2.11%)
PRL 85.40 Increased By ▲ 1.06 (1.26%)
PTC 45.55 Increased By ▲ 0.56 (1.24%)
SSGC 23.15 Increased By ▲ 0.32 (1.4%)
TBL 9.08 Increased By ▲ 0.20 (2.25%)
TELE 6.61 Increased By ▲ 0.11 (1.69%)
TPL 25.35 Increased By ▲ 1.09 (4.49%)
TPLP 13.19 Increased By ▲ 1.20 (10.01%)
TREET 23.44 Increased By ▲ 0.30 (1.3%)
TRG 52.25 Increased By ▲ 0.78 (1.52%)

KARACHI: Twelve-hour power suspension to different areas of Sindh and Balochistan provinces ended on Monday, when the Wapda engineers restored all high transmission lines of the Guddu Thermal Power Station that had gone tripped due to dense smog.

Power supply to some areas of Hyderabad, Larkana, Sukkur, Rahimyar Khan, Jaffarabad and other areas of Sindh and Balochistan was suspended due to the tripping of high-tension cables but after hectic efforts of 12 hours the problem was resolved and 1750mw electricity added to the system.

Copyright PPI (Pakistan Press International), 2017
 

 

 

Comments

Comments are closed for this article.