AIRLINK 72.18 Increased By ▲ 0.49 (0.68%)
BOP 4.93 Decreased By ▼ -0.07 (-1.4%)
CNERGY 4.35 Decreased By ▼ -0.04 (-0.91%)
DFML 28.49 Decreased By ▼ -0.06 (-0.21%)
DGKC 81.30 Decreased By ▼ -1.10 (-1.33%)
FCCL 21.50 Decreased By ▼ -0.45 (-2.05%)
FFBL 33.05 Decreased By ▼ -1.10 (-3.22%)
FFL 9.86 Decreased By ▼ -0.22 (-2.18%)
GGL 10.48 Increased By ▲ 0.36 (3.56%)
HBL 114.00 Increased By ▲ 1.00 (0.88%)
HUBC 140.00 Decreased By ▼ -0.50 (-0.36%)
HUMNL 9.03 Increased By ▲ 1.00 (12.45%)
KEL 4.73 Increased By ▲ 0.35 (7.99%)
KOSM 4.38 Decreased By ▼ -0.12 (-2.67%)
MLCF 37.65 Decreased By ▼ -0.36 (-0.95%)
OGDC 133.70 Decreased By ▼ -0.99 (-0.74%)
PAEL 25.60 Decreased By ▼ -1.02 (-3.83%)
PIAA 23.98 Decreased By ▼ -1.42 (-5.59%)
PIBTL 6.48 Decreased By ▼ -0.07 (-1.07%)
PPL 122.62 Increased By ▲ 0.67 (0.55%)
PRL 27.07 Decreased By ▼ -0.66 (-2.38%)
PTC 13.60 Decreased By ▼ -0.20 (-1.45%)
SEARL 56.62 Increased By ▲ 1.73 (3.15%)
SNGP 69.24 Decreased By ▼ -0.46 (-0.66%)
SSGC 10.34 Decreased By ▼ -0.06 (-0.58%)
TELE 8.45 Decreased By ▼ -0.05 (-0.59%)
TPLP 11.28 Increased By ▲ 0.33 (3.01%)
TRG 61.21 Increased By ▲ 0.31 (0.51%)
UNITY 25.33 Increased By ▲ 0.11 (0.44%)
WTL 1.50 Increased By ▲ 0.22 (17.19%)
BR100 7,630 Decreased By -8.3 (-0.11%)
BR30 24,990 Increased By 18.4 (0.07%)
KSE100 72,602 Decreased By -159.4 (-0.22%)
KSE30 23,539 Decreased By -86.6 (-0.37%)

imageISLAMABAD: Minister for Railways Khawaja Saad Rafique on Friday told the National Assembly that there are 81 freight locomotive in Pakistan Railways which would be increase by 135 with in next three months.

Replying to a question, the minister said that Railway had earned Rs 11 billions from freight sector during the tenure present government.

He told that government has taken several steps to upgrade railway tracks including Karachi-Peshawar track under China Pakistan Economic Corridor (CPEC). He said that up gradation and doubling of Main Line (ML-I) of Pakistan Railways from Karachi to Peshawar (1872 Km) including Taxila-Havelian section (55 Km) and establishment of dry port near Havelian has been declared as `Early Harvest Project' under CPEC.

The Project also includes doubling of track from Shandara to Peshawar Cantt and increasing of speed to 160km/h, where possible, he informed.

He said up gradation of the project is being initiated shortly and expected to be completed in a period of five (05) years.

The minister said that ML-2 is 1254 Km long alternate railway line from Kotri to Attock City via Dadu-Larkana Jacobabad-DG Khan-BhakkarKundian.

He said up-gradation is part of CPEC but included in midterm (2020-2025) adding that feasibility study is completed by the consultant and is under scrutiny of the railways officers at HQ Office Lahore.

The existing railway line from Rohri to Kohi-Taftan via Quetta and Sibi-Spezand section (1022 Kms) and rail link from Quetta to Kotla Jam (538 Kms is called as ML-3 which will be used for exploitation of full capacity of Gwadar port and anticipated traffic from China after establishment of China-Pakistan Economic Corridor (CPEC), he told.

He said feasibility study has been approved by the Planning Commission on 17-01-2017 and the bidding process for its award is in process.

Comments

Comments are closed.