BR100 Increased By (1.44%)
BR30 Increased By (1.71%)
KSE100 Increased By (1.21%)
KSE30 Increased By (1.26%)
BECO 5.65 Increased By ▲ 0.06 (1.07%)
BML 62.00 Increased By ▲ 0.97 (1.59%)
BOP 33.85 Increased By ▲ 0.60 (1.8%)
CNERGY 8.16 Increased By ▲ 0.11 (1.37%)
DCL 11.52 Increased By ▲ 0.22 (1.95%)
FCCL 53.80 Increased By ▲ 0.87 (1.64%)
FCSC 5.45 Increased By ▲ 0.11 (2.06%)
FFL 17.88 Increased By ▲ 0.27 (1.53%)
FNEL 1.33 Increased By ▲ 0.02 (1.53%)
HUMNL 11.10 Decreased By ▼ -0.02 (-0.18%)
KEL 8.05 Increased By ▲ 0.16 (2.03%)
KOSM 5.39 Increased By ▲ 0.06 (1.13%)
MLCF 86.77 Increased By ▲ 1.42 (1.66%)
NBP 184.32 Increased By ▲ 3.03 (1.67%)
PACE 11.75 Increased By ▲ 0.22 (1.91%)
PAEL 40.22 Increased By ▲ 0.81 (2.06%)
PIAHCLA 25.99 Increased By ▲ 0.36 (1.4%)
PIBTL 17.38 Increased By ▲ 0.23 (1.34%)
PPL 228.38 Increased By ▲ 3.56 (1.58%)
PRL 34.60 Increased By ▲ 0.42 (1.23%)
PTC 66.45 Increased By ▲ 1.37 (2.11%)
SEARL 91.11 Increased By ▲ 1.51 (1.69%)
SSGC 26.69 Increased By ▲ 0.38 (1.44%)
TELE 8.46 Increased By ▲ 0.08 (0.95%)
THCCL 71.52 Increased By ▲ 2.18 (3.14%)
TPLP 10.87 Increased By ▲ 0.59 (5.74%)
TREET 24.59 Increased By ▲ 0.39 (1.61%)
TRG 70.82 Increased By ▲ 1.28 (1.84%)
WAVES 11.29 Increased By ▲ 0.26 (2.36%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)

ISLAMABAD: Minister for Power Omar Ayub Khan has said that transmission system is being improved to meet electricity demand in the summer season.

In an interview with PTV, he said all the loopholes in the system from power generation to its transmission are being addressed.

He said action has been taken against the power pilferage. Thirty thousand cases were registered and about three thousand people involved in the pilferage were sent behind the bars. He said as part of this campaign, four hundred employees of WAPDA were also suspended.

The Minister said that latest technology is being introduced to improve the efficiency of the power sector.

He said the share of solar and wind in the power production will be enhanced. Omar Ayub said that seven hundred and fifty megawatts of electricity will be added to the system in the next fourteen months.

Copyright PPI (Pakistan Press International), 2019
 

Comments

Comments are closed for this article.