AIRLINK 66.00 Increased By ▲ 0.10 (0.15%)
BOP 5.72 Increased By ▲ 0.03 (0.53%)
CNERGY 4.60 Decreased By ▼ -0.05 (-1.08%)
DFML 23.24 Increased By ▲ 0.39 (1.71%)
DGKC 71.40 Increased By ▲ 0.70 (0.99%)
FCCL 20.55 Increased By ▲ 0.20 (0.98%)
FFBL 29.33 Increased By ▲ 0.22 (0.76%)
FFL 9.97 Increased By ▲ 0.04 (0.4%)
GGL 10.16 Increased By ▲ 0.08 (0.79%)
HBL 115.93 Increased By ▲ 0.68 (0.59%)
HUBC 130.16 Increased By ▲ 0.66 (0.51%)
HUMNL 6.66 Decreased By ▼ -0.04 (-0.6%)
KEL 4.45 Increased By ▲ 0.07 (1.6%)
KOSM 5.06 Increased By ▲ 0.04 (0.8%)
MLCF 37.30 Increased By ▲ 0.34 (0.92%)
OGDC 131.20 No Change ▼ 0.00 (0%)
PAEL 22.84 Increased By ▲ 0.36 (1.6%)
PIAA 26.26 Decreased By ▼ -0.04 (-0.15%)
PIBTL 6.57 Increased By ▲ 0.04 (0.61%)
PPL 112.22 Increased By ▲ 0.10 (0.09%)
PRL 28.31 Decreased By ▼ -0.08 (-0.28%)
PTC 16.24 Increased By ▲ 0.13 (0.81%)
SEARL 58.10 Decreased By ▼ -0.19 (-0.33%)
SNGP 65.81 Increased By ▲ 0.12 (0.18%)
SSGC 11.07 Increased By ▲ 0.05 (0.45%)
TELE 8.98 Increased By ▲ 0.04 (0.45%)
TPLP 11.90 Increased By ▲ 0.37 (3.21%)
TRG 69.20 Decreased By ▼ -0.04 (-0.06%)
UNITY 23.90 Decreased By ▼ -0.05 (-0.21%)
WTL 1.36 Increased By ▲ 0.01 (0.74%)
BR100 7,323 Increased By 19.3 (0.26%)
BR30 24,039 Increased By 88.9 (0.37%)
KSE100 70,535 Increased By 201.5 (0.29%)
KSE30 23,200 Increased By 79.7 (0.34%)

ISLAMABAD: Pakistan Railways has rehabilitated and reconstructed around 230 bridges across the country to ensure smooth trains operation besides reducing the travel duration.

“Around 86 percent of railways bridges are more than 100 years old but all bridges are safe for train operation due to effective maintenance owing to regular maintenance, rehabilitation and strengthening of these bridges,” an official in the Ministry of Railways told APP.

He said there are 13,959 major and minor bridges over the system and the design life of which varies for different years.

The Standard Operating Procedure for inspection of bridges in accordance with the different schedules like monthly, quarterly, biannually and annually. The official said average 77.10 percent of track is over-aged and minor repair are carried out departmentally in routine to ensure safety of the passengers.

However, he said 730 kilometers track has been rehabilitated or partially rehabilitated through complete track renewal, sleeper renewal and rail renewal under different PSDP projects.

To a question, the official said Pakistan Railways has finalized a plan to upgrade its track from Karachi-Peshawar via Lahore in the next five years under China Pakistan Economic Corridor project.

He said Pakistan Railways track from Lahore - Peshawar via Rawalpindi will be dialyzes in the next five years.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed.