AIRLINK 65.20 Decreased By ▼ -0.70 (-1.06%)
BOP 5.57 Decreased By ▼ -0.12 (-2.11%)
CNERGY 4.56 Decreased By ▼ -0.09 (-1.94%)
DFML 24.52 Increased By ▲ 1.67 (7.31%)
DGKC 69.96 Decreased By ▼ -0.74 (-1.05%)
FCCL 20.30 Decreased By ▼ -0.05 (-0.25%)
FFBL 29.11 No Change ▼ 0.00 (0%)
FFL 9.83 Decreased By ▼ -0.10 (-1.01%)
GGL 10.01 Decreased By ▼ -0.07 (-0.69%)
HBL 114.25 Decreased By ▼ -1.00 (-0.87%)
HUBC 129.10 Decreased By ▼ -0.40 (-0.31%)
HUMNL 6.71 Increased By ▲ 0.01 (0.15%)
KEL 4.44 Increased By ▲ 0.06 (1.37%)
KOSM 4.89 Decreased By ▼ -0.13 (-2.59%)
MLCF 37.00 Increased By ▲ 0.04 (0.11%)
OGDC 132.30 Increased By ▲ 1.10 (0.84%)
PAEL 22.54 Increased By ▲ 0.06 (0.27%)
PIAA 25.89 Decreased By ▼ -0.41 (-1.56%)
PIBTL 6.60 Increased By ▲ 0.07 (1.07%)
PPL 112.85 Increased By ▲ 0.73 (0.65%)
PRL 29.41 Increased By ▲ 1.02 (3.59%)
PTC 15.24 Decreased By ▼ -0.87 (-5.4%)
SEARL 57.03 Decreased By ▼ -1.26 (-2.16%)
SNGP 66.45 Increased By ▲ 0.76 (1.16%)
SSGC 10.98 Decreased By ▼ -0.04 (-0.36%)
TELE 8.80 Decreased By ▼ -0.14 (-1.57%)
TPLP 11.70 Increased By ▲ 0.17 (1.47%)
TRG 68.62 Decreased By ▼ -0.62 (-0.9%)
UNITY 23.40 Decreased By ▼ -0.55 (-2.3%)
WTL 1.38 Increased By ▲ 0.03 (2.22%)
BR100 7,295 No Change 0 (0%)
BR30 23,854 No Change 0 (0%)
KSE100 70,424 Increased By 133.6 (0.19%)
KSE30 23,156 Decreased By -15.1 (-0.07%)

imageCAPE CANAVERAL: NASA's test run of a Mars landing system came to a quick end on Monday when the saucer-shaped vehicle's parachute tore away after partly unfurling high over the Pacific Ocean, a NASA TV broadcast showed.

A similar problem bedeviled the Low Density Supersonic Decelerator's (LDSD) debut run last year. The parachute was redesigned and reinforced for the second flight, but more work will be needed before the system is ready to land heavy loads on Mars.

"This is exactly why we do tests like this," NASA engineer and LDSD mission commentator Dan Coatta said after the test. "When we're actually ready to send spacecraft to Mars, we know that they are going to work when that big mission is on the line."

The 100-foot diameter parachute - the largest ever tested - was the second part of a two-part supersonic braking system NASA has been developing for about five years, at a cost of about $230 million.

Like last year, LDSD's doughnut-shaped extension ring inflated as expected, adding surface area to increase the amount of friction and slow the vehicle's descent through the atmosphere.

Copyright Reuters, 2015

Comments

Comments are closed.