AIRLINK 73.65 Increased By ▲ 0.65 (0.89%)
BOP 5.29 Decreased By ▼ -0.06 (-1.12%)
CNERGY 4.33 Increased By ▲ 0.02 (0.46%)
DFML 27.49 Decreased By ▼ -1.06 (-3.71%)
DGKC 77.65 Increased By ▲ 3.36 (4.52%)
FCCL 20.47 Increased By ▲ 0.12 (0.59%)
FFBL 31.65 Increased By ▲ 0.75 (2.43%)
FFL 10.23 Increased By ▲ 0.17 (1.69%)
GGL 10.40 Increased By ▲ 0.01 (0.1%)
HBL 117.90 Increased By ▲ 1.93 (1.66%)
HUBC 134.75 Increased By ▲ 2.55 (1.93%)
HUMNL 6.75 Increased By ▲ 0.07 (1.05%)
KEL 4.16 Increased By ▲ 0.13 (3.23%)
KOSM 4.80 Increased By ▲ 0.20 (4.35%)
MLCF 38.90 Increased By ▲ 0.36 (0.93%)
OGDC 135.00 Increased By ▲ 1.15 (0.86%)
PAEL 23.41 Decreased By ▼ -0.42 (-1.76%)
PIAA 26.71 Decreased By ▼ -0.42 (-1.55%)
PIBTL 7.00 Increased By ▲ 0.24 (3.55%)
PPL 113.50 Increased By ▲ 0.70 (0.62%)
PRL 27.65 Decreased By ▼ -0.51 (-1.81%)
PTC 14.54 Decreased By ▼ -0.35 (-2.35%)
SEARL 56.00 Decreased By ▼ -0.42 (-0.74%)
SNGP 65.78 Decreased By ▼ -0.02 (-0.03%)
SSGC 11.00 Decreased By ▼ -0.01 (-0.09%)
TELE 9.02 No Change ▼ 0.00 (0%)
TPLP 11.77 Decreased By ▼ -0.13 (-1.09%)
TRG 69.35 Increased By ▲ 0.25 (0.36%)
UNITY 23.70 Decreased By ▼ -0.01 (-0.04%)
WTL 1.34 Increased By ▲ 0.01 (0.75%)
BR100 7,493 Increased By 58.3 (0.78%)
BR30 24,449 Increased By 229.5 (0.95%)
KSE100 72,079 Increased By 719.7 (1.01%)
KSE30 23,820 Increased By 253.6 (1.08%)

imageCAPE CANAVERAL: NASA's test run of a Mars landing system came to a quick end on Monday when the saucer-shaped vehicle's parachute tore away after partly unfurling high over the Pacific Ocean, a NASA TV broadcast showed.

A similar problem bedeviled the Low Density Supersonic Decelerator's (LDSD) debut run last year. The parachute was redesigned and reinforced for the second flight, but more work will be needed before the system is ready to land heavy loads on Mars.

"This is exactly why we do tests like this," NASA engineer and LDSD mission commentator Dan Coatta said after the test. "When we're actually ready to send spacecraft to Mars, we know that they are going to work when that big mission is on the line."

The 100-foot diameter parachute - the largest ever tested - was the second part of a two-part supersonic braking system NASA has been developing for about five years, at a cost of about $230 million.

Like last year, LDSD's doughnut-shaped extension ring inflated as expected, adding surface area to increase the amount of friction and slow the vehicle's descent through the atmosphere.

Copyright Reuters, 2015

Comments

Comments are closed.