AIRLINK 69.92 Increased By ▲ 4.72 (7.24%)
BOP 5.46 Decreased By ▼ -0.11 (-1.97%)
CNERGY 4.50 Decreased By ▼ -0.06 (-1.32%)
DFML 25.71 Increased By ▲ 1.19 (4.85%)
DGKC 69.85 Decreased By ▼ -0.11 (-0.16%)
FCCL 20.02 Decreased By ▼ -0.28 (-1.38%)
FFBL 30.69 Increased By ▲ 1.58 (5.43%)
FFL 9.75 Decreased By ▼ -0.08 (-0.81%)
GGL 10.12 Increased By ▲ 0.11 (1.1%)
HBL 114.90 Increased By ▲ 0.65 (0.57%)
HUBC 132.10 Increased By ▲ 3.00 (2.32%)
HUMNL 6.73 Increased By ▲ 0.02 (0.3%)
KEL 4.44 No Change ▼ 0.00 (0%)
KOSM 4.93 Increased By ▲ 0.04 (0.82%)
MLCF 36.45 Decreased By ▼ -0.55 (-1.49%)
OGDC 133.90 Increased By ▲ 1.60 (1.21%)
PAEL 22.50 Decreased By ▼ -0.04 (-0.18%)
PIAA 25.39 Decreased By ▼ -0.50 (-1.93%)
PIBTL 6.61 Increased By ▲ 0.01 (0.15%)
PPL 113.20 Increased By ▲ 0.35 (0.31%)
PRL 30.12 Increased By ▲ 0.71 (2.41%)
PTC 14.70 Decreased By ▼ -0.54 (-3.54%)
SEARL 57.55 Increased By ▲ 0.52 (0.91%)
SNGP 66.60 Increased By ▲ 0.15 (0.23%)
SSGC 10.99 Increased By ▲ 0.01 (0.09%)
TELE 8.77 Decreased By ▼ -0.03 (-0.34%)
TPLP 11.51 Decreased By ▼ -0.19 (-1.62%)
TRG 68.61 Decreased By ▼ -0.01 (-0.01%)
UNITY 23.47 Increased By ▲ 0.07 (0.3%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 7,399 Increased By 104.2 (1.43%)
BR30 24,136 Increased By 282 (1.18%)
KSE100 70,910 Increased By 619.8 (0.88%)
KSE30 23,377 Increased By 205.6 (0.89%)

imageFAISALABAD: Prime Minister Muhammad Nawaz Sharif Saturday inaugurated 40 megawatts (MW), coal fired power project at Sitara Chemical Industries Ltd (SCIL) here.

The prime minister was accompanied by Governor Punjab Malik Rafiq Rajwana, Minister for Water and Power Khawaja Asif, Minister for Planning Ahsan Iqbal, Minister for Commerce Khurram Dastgir and Minister of State for Water and Power Abid Sher Ali.

The 40 MW coal power plant at Sitara Chemical Industries Ltd is the largest of its kind in the industrial sector of Faisalabad. Sitara Chemical Industries Ltd is the flagship company of Sitara Group.

The prime minister unveiled the plaque of the project that has been completed within 27 months costing Rs 3.5 billion.

The plant's boiler is based on Circulating Fluidized Bed Combustion technology having the best automation system.

Continuous emission monitoring system is placed which monitors 24/7 the emission of the gases in the air to protect the environment.

According to a PM House statement, commissioning of 40 mega watts Coal Fired Power Plant is a step towards achieving self-reliance in power generation. Such initiatives by the private sector are extremely encouraging and will prove helpful in overcoming the energy shortage from Pakistan.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.