DIAMER: Efforts are underway to fix the technical fault emerged at Thank Phase-II power house and soon load-shedding would be resolved in the district.
This was stated by Executive Engineer Water & Power Sher Bahadur while talking to APP on Wednesday.
He said the services of two engineers from Lahore was acquired who would work with the experts of Norway workshop to resolve the problem.
Currently, the masses living in Chilas city were being supplied electricity through generators, he said.
He appealed the masses to use energy savers and avoid using heavy electric equipments.
Sher Bahadur said the connections of those using electricity without paying monthly dues would be disconnected.
Comments
Comments are closed.