AIRLINK 79.41 Increased By ▲ 1.02 (1.3%)
BOP 5.33 Decreased By ▼ -0.01 (-0.19%)
CNERGY 4.38 Increased By ▲ 0.05 (1.15%)
DFML 33.19 Increased By ▲ 2.32 (7.52%)
DGKC 76.87 Decreased By ▼ -1.64 (-2.09%)
FCCL 20.53 Decreased By ▼ -0.05 (-0.24%)
FFBL 31.40 Decreased By ▼ -0.90 (-2.79%)
FFL 9.85 Decreased By ▼ -0.37 (-3.62%)
GGL 10.25 Decreased By ▼ -0.04 (-0.39%)
HBL 117.93 Decreased By ▼ -0.57 (-0.48%)
HUBC 134.10 Decreased By ▼ -1.00 (-0.74%)
HUMNL 7.00 Increased By ▲ 0.13 (1.89%)
KEL 4.67 Increased By ▲ 0.50 (11.99%)
KOSM 4.74 Increased By ▲ 0.01 (0.21%)
MLCF 37.44 Decreased By ▼ -1.23 (-3.18%)
OGDC 136.70 Increased By ▲ 1.85 (1.37%)
PAEL 23.15 Decreased By ▼ -0.25 (-1.07%)
PIAA 26.55 Decreased By ▼ -0.09 (-0.34%)
PIBTL 7.00 Decreased By ▼ -0.02 (-0.28%)
PPL 113.75 Increased By ▲ 0.30 (0.26%)
PRL 27.52 Decreased By ▼ -0.21 (-0.76%)
PTC 14.75 Increased By ▲ 0.15 (1.03%)
SEARL 57.20 Increased By ▲ 0.70 (1.24%)
SNGP 67.50 Increased By ▲ 1.20 (1.81%)
SSGC 11.09 Increased By ▲ 0.15 (1.37%)
TELE 9.23 Increased By ▲ 0.08 (0.87%)
TPLP 11.56 Decreased By ▼ -0.11 (-0.94%)
TRG 72.10 Increased By ▲ 0.67 (0.94%)
UNITY 24.82 Increased By ▲ 0.31 (1.26%)
WTL 1.40 Increased By ▲ 0.07 (5.26%)
BR100 7,526 Increased By 32.9 (0.44%)
BR30 24,650 Increased By 91.4 (0.37%)
KSE100 71,971 Decreased By -80.5 (-0.11%)
KSE30 23,749 Decreased By -58.8 (-0.25%)

power-transmissionMUZAFFARGARH: Oil supply to power plants in the country has been increased to 25‚000 metric tonnes from 12‚000 metric tonnes to operate them at maximum capacity and no plant running on fuel is closed due to oil shortage, Federal Information Minister Qamar Zaman Kaira said on Monday.

Talking to newsmen along with Water & Power Minister Ch. Ahmad Mukhtar in Muzaffargarh‚ he said windstorm damaged 500KV and 220KV main electricity lines few days back in Muzaffargarh‚ causing loss of 1800MW. He said two lines have been restored which added 1100MW electricity to national grid. By Monday evening‚ 350MW Lal Peer plant will also be restored.
Kaira said the two 325MW each power plants of Chashma have also resumed production due to which generation capacity has improved and stabilized.

He said the government has initiated short, medium and long term measures in order to overcome electricity crisis in the country.
He asked Punjab Chief Minister to avoid politics on issue of load shedding and said under the 18th Constitution amendment‚ the provinces are empowered to generate electricity on their own.

Copyright PPI (Pakistan Press International), 2012

Comments

Comments are closed.