AIRLINK 79.41 Increased By ▲ 1.02 (1.3%)
BOP 5.33 Decreased By ▼ -0.01 (-0.19%)
CNERGY 4.38 Increased By ▲ 0.05 (1.15%)
DFML 33.19 Increased By ▲ 2.32 (7.52%)
DGKC 76.87 Decreased By ▼ -1.64 (-2.09%)
FCCL 20.53 Decreased By ▼ -0.05 (-0.24%)
FFBL 31.40 Decreased By ▼ -0.90 (-2.79%)
FFL 9.85 Decreased By ▼ -0.37 (-3.62%)
GGL 10.25 Decreased By ▼ -0.04 (-0.39%)
HBL 117.93 Decreased By ▼ -0.57 (-0.48%)
HUBC 134.10 Decreased By ▼ -1.00 (-0.74%)
HUMNL 7.00 Increased By ▲ 0.13 (1.89%)
KEL 4.67 Increased By ▲ 0.50 (11.99%)
KOSM 4.74 Increased By ▲ 0.01 (0.21%)
MLCF 37.44 Decreased By ▼ -1.23 (-3.18%)
OGDC 136.70 Increased By ▲ 1.85 (1.37%)
PAEL 23.15 Decreased By ▼ -0.25 (-1.07%)
PIAA 26.55 Decreased By ▼ -0.09 (-0.34%)
PIBTL 7.00 Decreased By ▼ -0.02 (-0.28%)
PPL 113.75 Increased By ▲ 0.30 (0.26%)
PRL 27.52 Decreased By ▼ -0.21 (-0.76%)
PTC 14.75 Increased By ▲ 0.15 (1.03%)
SEARL 57.20 Increased By ▲ 0.70 (1.24%)
SNGP 67.50 Increased By ▲ 1.20 (1.81%)
SSGC 11.09 Increased By ▲ 0.15 (1.37%)
TELE 9.23 Increased By ▲ 0.08 (0.87%)
TPLP 11.56 Decreased By ▼ -0.11 (-0.94%)
TRG 72.10 Increased By ▲ 0.67 (0.94%)
UNITY 24.82 Increased By ▲ 0.31 (1.26%)
WTL 1.40 Increased By ▲ 0.07 (5.26%)
BR100 7,526 Increased By 32.9 (0.44%)
BR30 24,650 Increased By 91.4 (0.37%)
KSE100 71,971 Decreased By -80.5 (-0.11%)
KSE30 23,749 Decreased By -58.8 (-0.25%)
Pakistan

30pc industrial units remain closed as gas pressure drops

RECORDER REPORT KARACHI: In SITE industrial area, 25 to 30 per cent industrial units remained closed on the third con
Published July 22, 2012

textile--RECORDER REPORT

KARACHI: In SITE industrial area, 25 to 30 per cent industrial units remained closed on the third consecutive day as gas pressure dropped.

Chairman, SITE Association of Industry (SAI), Muhammad Irfan Moton has said that industry is suffering huge losses due to continuous closure.

He said that industries had to meet their export commitments in time and for which they needed uninterrupted supply of gas, water and electricity.

He said that the industrial production had stopped on Thursday as soon as the gas pressure dropped. Resultantly, several captive power generating units also stopped functioning.

He further said that this problem was being faced only by the industrialists of SITE Area whereas the other industrial areas of Karachi were getting smooth supply which means that a discriminatory attitude was being adopted by SSGCL with the industries of SITE Area. The authorities concerned should take appropriate action in this connection, he said.

Chairman SITE Association demanded Managing Director, SSGCL to take necessary steps for improvement of the gas pressure in the biggest industrial estate of the country on war footing basis.

Comments

Comments are closed.