AIRLINK 78.39 Increased By ▲ 5.39 (7.38%)
BOP 5.34 Decreased By ▼ -0.01 (-0.19%)
CNERGY 4.33 Increased By ▲ 0.02 (0.46%)
DFML 30.87 Increased By ▲ 2.32 (8.13%)
DGKC 78.51 Increased By ▲ 4.22 (5.68%)
FCCL 20.58 Increased By ▲ 0.23 (1.13%)
FFBL 32.30 Increased By ▲ 1.40 (4.53%)
FFL 10.22 Increased By ▲ 0.16 (1.59%)
GGL 10.29 Decreased By ▼ -0.10 (-0.96%)
HBL 118.50 Increased By ▲ 2.53 (2.18%)
HUBC 135.10 Increased By ▲ 2.90 (2.19%)
HUMNL 6.87 Increased By ▲ 0.19 (2.84%)
KEL 4.17 Increased By ▲ 0.14 (3.47%)
KOSM 4.73 Increased By ▲ 0.13 (2.83%)
MLCF 38.67 Increased By ▲ 0.13 (0.34%)
OGDC 134.85 Increased By ▲ 1.00 (0.75%)
PAEL 23.40 Decreased By ▼ -0.43 (-1.8%)
PIAA 26.64 Decreased By ▼ -0.49 (-1.81%)
PIBTL 7.02 Increased By ▲ 0.26 (3.85%)
PPL 113.45 Increased By ▲ 0.65 (0.58%)
PRL 27.73 Decreased By ▼ -0.43 (-1.53%)
PTC 14.60 Decreased By ▼ -0.29 (-1.95%)
SEARL 56.50 Increased By ▲ 0.08 (0.14%)
SNGP 66.30 Increased By ▲ 0.50 (0.76%)
SSGC 10.94 Decreased By ▼ -0.07 (-0.64%)
TELE 9.15 Increased By ▲ 0.13 (1.44%)
TPLP 11.67 Decreased By ▼ -0.23 (-1.93%)
TRG 71.43 Increased By ▲ 2.33 (3.37%)
UNITY 24.51 Increased By ▲ 0.80 (3.37%)
WTL 1.33 No Change ▼ 0.00 (0%)
BR100 7,493 Increased By 58.6 (0.79%)
BR30 24,558 Increased By 338.4 (1.4%)
KSE100 72,052 Increased By 692.5 (0.97%)
KSE30 23,808 Increased By 241 (1.02%)

electicity-polesISLAMABAD: The government is set to complete around half dozen hydel power projects of 381 MW accumulative capacity by the end of this year.

Official sources in WAPDA told APP here Friday that Jinnah (96 MW), Allai Khwar (121 MW), Duber Khwar (130 MW) hydropower projects, Satpara (17 MW) and Gomal Zam dams (17 MW) would be completed by December.

They said that Allai Khwar was located on Allai Khwar River, near Besham District Battagram while Duber Khwar project was being constructed on Khan Khwar River near Pattan District Kohistan.

Jinnah hydropower project is located on the right side of existing Jinnah Barrage, 5 km from Kalabagh town in District Mianwal and according to PC-I it would cost Rs. 13546.8 million with Foreign Exchange Component of Rs. 6608.221 Million.

Satpara dam is being constructed on Satpara Nullah downstream of Satpara Lake with an estimated cost of Rs.4480.021 million.

The project would generate 17.36 MW of hydropower besides irrigating 15.536 acres of land and supply 3.1 million gallons per day drinking water to Skardu city.

Similary, Gomal Zam Dam site (Khajuri Kach) is being constructed on Gomal River in South Waziristan Agency, west of Tank and D.I.Khan Districts of Khyber Pakhtun Khwa (KPK) Province and would cost Rs.12829 million including Rs.4964 FEC.

They said that the project would provide 316,232 Acre-feet of water annually to irrigate about 163,086 acres and generate 17.4 MW cheap hydel electricity.

Copyright APP (Associated Press of Pakistan), 2012

Comments

Comments are closed.