BR100 Increased By (0.99%)
BR30 Increased By (1.17%)
KSE100 Increased By (0.81%)
KSE30 Increased By (0.77%)
BECO 5.68 Increased By ▲ 0.09 (1.61%)
BML 64.84 Increased By ▲ 3.81 (6.24%)
BOP 33.60 Increased By ▲ 0.35 (1.05%)
CNERGY 8.24 Increased By ▲ 0.19 (2.36%)
DCL 11.35 Increased By ▲ 0.05 (0.44%)
FCCL 52.91 Decreased By ▼ -0.02 (-0.04%)
FCSC 5.52 Increased By ▲ 0.18 (3.37%)
FFL 17.80 Increased By ▲ 0.19 (1.08%)
FNEL 1.30 Decreased By ▼ -0.01 (-0.76%)
HUMNL 11.24 Increased By ▲ 0.12 (1.08%)
KEL 7.97 Increased By ▲ 0.08 (1.01%)
KOSM 5.44 Increased By ▲ 0.11 (2.06%)
MLCF 86.01 Increased By ▲ 0.66 (0.77%)
NBP 185.00 Increased By ▲ 3.71 (2.05%)
PACE 12.02 Increased By ▲ 0.49 (4.25%)
PAEL 40.21 Increased By ▲ 0.80 (2.03%)
PIAHCLA 25.73 Increased By ▲ 0.10 (0.39%)
PIBTL 17.32 Increased By ▲ 0.17 (0.99%)
PPL 225.30 Increased By ▲ 0.48 (0.21%)
PRL 34.38 Increased By ▲ 0.20 (0.59%)
PTC 65.46 Increased By ▲ 0.38 (0.58%)
SEARL 90.51 Increased By ▲ 0.91 (1.02%)
SSGC 26.76 Increased By ▲ 0.45 (1.71%)
TELE 8.96 Increased By ▲ 0.58 (6.92%)
THCCL 69.44 Increased By ▲ 0.10 (0.14%)
TPLP 11.31 Increased By ▲ 1.03 (10.02%)
TREET 24.55 Increased By ▲ 0.35 (1.45%)
TRG 71.67 Increased By ▲ 2.13 (3.06%)
WAVES 11.45 Increased By ▲ 0.42 (3.81%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
Pakistan

Power shortfall jumps to 2,420 MW

ISLAMABAD : The electricity shortfall in the country on Wednesday again surged to 2,420 MW from 2,270 MW as the total po
Published May 25, 2011 Updated May 25, 2011 09:09am

kescISLAMABAD: The electricity shortfall in the country on Wednesday again surged to 2,420 MW from 2,270 MW as the total power generation was recorded as 13,589 MW against the demand of 16,009 MW during the last 24 hours.

According to the brief on daily power generation and load-management position, the hydel generation stood at 5,419 MW, WAPDA thermal 1,659 MW, IPPs 6,514 MW and Rental 97 MW.

As many as 690 MW was supplied to Karachi Electric Supply Company (KESC), the report further said.

The water level at Tarbela and Mangla dams was recorded as 1434.36 feet and 1153.95 feet with water release of 100,000 cusecs and 50,000 cusecs respectively.

 

Copyright APP (Associated Press of Pakistan), 2011

 

Comments

Comments are closed for this article.