AIRLINK 73.50 Increased By ▲ 0.50 (0.68%)
BOP 5.28 Decreased By ▼ -0.07 (-1.31%)
CNERGY 4.34 Increased By ▲ 0.03 (0.7%)
DFML 27.40 Decreased By ▼ -1.15 (-4.03%)
DGKC 77.80 Increased By ▲ 3.51 (4.72%)
FCCL 20.46 Increased By ▲ 0.11 (0.54%)
FFBL 31.65 Increased By ▲ 0.75 (2.43%)
FFL 10.24 Increased By ▲ 0.18 (1.79%)
GGL 10.42 Increased By ▲ 0.03 (0.29%)
HBL 117.50 Increased By ▲ 1.53 (1.32%)
HUBC 134.57 Increased By ▲ 2.37 (1.79%)
HUMNL 6.73 Increased By ▲ 0.05 (0.75%)
KEL 4.15 Increased By ▲ 0.12 (2.98%)
KOSM 4.81 Increased By ▲ 0.21 (4.57%)
MLCF 38.90 Increased By ▲ 0.36 (0.93%)
OGDC 134.89 Increased By ▲ 1.04 (0.78%)
PAEL 23.42 Decreased By ▼ -0.41 (-1.72%)
PIAA 26.74 Decreased By ▼ -0.39 (-1.44%)
PIBTL 6.96 Increased By ▲ 0.20 (2.96%)
PPL 113.53 Increased By ▲ 0.73 (0.65%)
PRL 27.61 Decreased By ▼ -0.55 (-1.95%)
PTC 14.54 Decreased By ▼ -0.35 (-2.35%)
SEARL 56.05 Decreased By ▼ -0.37 (-0.66%)
SNGP 65.79 Decreased By ▼ -0.01 (-0.02%)
SSGC 11.00 Decreased By ▼ -0.01 (-0.09%)
TELE 9.03 Increased By ▲ 0.01 (0.11%)
TPLP 11.75 Decreased By ▼ -0.15 (-1.26%)
TRG 69.35 Increased By ▲ 0.25 (0.36%)
UNITY 23.70 Decreased By ▼ -0.01 (-0.04%)
WTL 1.34 Increased By ▲ 0.01 (0.75%)
BR100 7,495 Increased By 61.1 (0.82%)
BR30 24,447 Increased By 227 (0.94%)
KSE100 72,083 Increased By 723.5 (1.01%)
KSE30 23,816 Increased By 249.5 (1.06%)

imageISLAMABAD: The Cabinet Committee on Energy Wednesday reviewed progress on the ongoing power projects to assess whether the time-lines of the schedule of activities were being observed.

Finance Minister Senator Mohammad Ishaq Dar chaired the meeting which also reviewed the progress of on-going power sector projects in the country and the projects in pipeline.

Federal Minister for Water and Power, Khawaja Muhammad Asif, Federal Minister for Petroleum and Natural Resources, Shahid Khaqan Abbasi and Secretary to Prime Minister and senior officials of the relevant ministries attended the meeting.

Secretary Water and Power briefed the meeting on the energy projects and also dilated on arrangements for evacuation of the electricity to be produced in future.

Secretary Ministry of Petroleum and Natural Resources gave an overview of the supply of natural gas and fuel that would be needed to facilitate the upcoming power projects.

Secretary Water and Power also briefed the meeting about the current state of power generation in the country.

He said that in line with the Prime Minister's instructions, maximum facilitation has been provided to general public during the holy month of Ramazan by ensuring smooth and uninterrupted supply of electricity at the time of Sehar and Iftar.

A proper mechanism has been in place to address complaints of any breakdown, he said adding despite severe heat wave experienced in early May and the resultant increased power usage, load management has been carried out with due care.

Furthermore no power unit suffered any shut down this summer which helped maintain supply of electricity to the optimum possible level.

The Finance Minister, on the occasion said that the Prime Minister had desired a detailed update on the progress of ongoing projects and emphasized expediting work on these projects.

He directed the Ministry of Water and Power to ensure completion of on-going projects as per schedule. A detailed report containing up-to-date progress would be submitted to the Prime Minister.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.