AIRLINK 65.20 Decreased By ▼ -0.70 (-1.06%)
BOP 5.57 Decreased By ▼ -0.12 (-2.11%)
CNERGY 4.56 Decreased By ▼ -0.09 (-1.94%)
DFML 24.52 Increased By ▲ 1.67 (7.31%)
DGKC 69.96 Decreased By ▼ -0.74 (-1.05%)
FCCL 20.30 Decreased By ▼ -0.05 (-0.25%)
FFBL 29.11 No Change ▼ 0.00 (0%)
FFL 9.83 Decreased By ▼ -0.10 (-1.01%)
GGL 10.01 Decreased By ▼ -0.07 (-0.69%)
HBL 114.25 Decreased By ▼ -1.00 (-0.87%)
HUBC 129.10 Decreased By ▼ -0.40 (-0.31%)
HUMNL 6.71 Increased By ▲ 0.01 (0.15%)
KEL 4.44 Increased By ▲ 0.06 (1.37%)
KOSM 4.89 Decreased By ▼ -0.13 (-2.59%)
MLCF 37.00 Increased By ▲ 0.04 (0.11%)
OGDC 132.30 Increased By ▲ 1.10 (0.84%)
PAEL 22.54 Increased By ▲ 0.06 (0.27%)
PIAA 25.89 Decreased By ▼ -0.41 (-1.56%)
PIBTL 6.60 Increased By ▲ 0.07 (1.07%)
PPL 112.85 Increased By ▲ 0.73 (0.65%)
PRL 29.41 Increased By ▲ 1.02 (3.59%)
PTC 15.24 Decreased By ▼ -0.87 (-5.4%)
SEARL 57.03 Decreased By ▼ -1.26 (-2.16%)
SNGP 66.45 Increased By ▲ 0.76 (1.16%)
SSGC 10.98 Decreased By ▼ -0.04 (-0.36%)
TELE 8.80 Decreased By ▼ -0.14 (-1.57%)
TPLP 11.70 Increased By ▲ 0.17 (1.47%)
TRG 68.62 Decreased By ▼ -0.62 (-0.9%)
UNITY 23.40 Decreased By ▼ -0.55 (-2.3%)
WTL 1.38 Increased By ▲ 0.03 (2.22%)
BR100 7,295 Decreased By -9.1 (-0.12%)
BR30 23,854 Decreased By -96 (-0.4%)
KSE100 70,290 Decreased By -43.2 (-0.06%)
KSE30 23,171 Increased By 50.4 (0.22%)

imageISLAMABAD: The Cabinet Committee on Energy Wednesday reviewed progress on the ongoing power projects to assess whether the time-lines of the schedule of activities were being observed.

Finance Minister Senator Mohammad Ishaq Dar chaired the meeting which also reviewed the progress of on-going power sector projects in the country and the projects in pipeline.

Federal Minister for Water and Power, Khawaja Muhammad Asif, Federal Minister for Petroleum and Natural Resources, Shahid Khaqan Abbasi and Secretary to Prime Minister and senior officials of the relevant ministries attended the meeting.

Secretary Water and Power briefed the meeting on the energy projects and also dilated on arrangements for evacuation of the electricity to be produced in future.

Secretary Ministry of Petroleum and Natural Resources gave an overview of the supply of natural gas and fuel that would be needed to facilitate the upcoming power projects.

Secretary Water and Power also briefed the meeting about the current state of power generation in the country.

He said that in line with the Prime Minister's instructions, maximum facilitation has been provided to general public during the holy month of Ramazan by ensuring smooth and uninterrupted supply of electricity at the time of Sehar and Iftar.

A proper mechanism has been in place to address complaints of any breakdown, he said adding despite severe heat wave experienced in early May and the resultant increased power usage, load management has been carried out with due care.

Furthermore no power unit suffered any shut down this summer which helped maintain supply of electricity to the optimum possible level.

The Finance Minister, on the occasion said that the Prime Minister had desired a detailed update on the progress of ongoing projects and emphasized expediting work on these projects.

He directed the Ministry of Water and Power to ensure completion of on-going projects as per schedule. A detailed report containing up-to-date progress would be submitted to the Prime Minister.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.