BR100 Increased By (0.96%)
BR30 Increased By (1.15%)
KSE100 Increased By (0.82%)
KSE30 Increased By (0.79%)
BECO 5.69 Increased By ▲ 0.10 (1.79%)
BML 64.45 Increased By ▲ 3.42 (5.6%)
BOP 33.58 Increased By ▲ 0.33 (0.99%)
CNERGY 8.23 Increased By ▲ 0.18 (2.24%)
DCL 11.38 Increased By ▲ 0.08 (0.71%)
FCCL 52.80 Decreased By ▼ -0.13 (-0.25%)
FCSC 5.55 Increased By ▲ 0.21 (3.93%)
FFL 17.80 Increased By ▲ 0.19 (1.08%)
FNEL 1.31 No Change ▼ 0.00 (0%)
HUMNL 11.20 Increased By ▲ 0.08 (0.72%)
KEL 7.97 Increased By ▲ 0.08 (1.01%)
KOSM 5.45 Increased By ▲ 0.12 (2.25%)
MLCF 85.91 Increased By ▲ 0.56 (0.66%)
NBP 184.97 Increased By ▲ 3.68 (2.03%)
PACE 11.99 Increased By ▲ 0.46 (3.99%)
PAEL 40.15 Increased By ▲ 0.74 (1.88%)
PIAHCLA 25.80 Increased By ▲ 0.17 (0.66%)
PIBTL 17.25 Increased By ▲ 0.10 (0.58%)
PPL 225.50 Increased By ▲ 0.68 (0.3%)
PRL 34.20 Increased By ▲ 0.02 (0.06%)
PTC 65.56 Increased By ▲ 0.48 (0.74%)
SEARL 90.50 Increased By ▲ 0.90 (1%)
SSGC 26.84 Increased By ▲ 0.53 (2.01%)
TELE 8.84 Increased By ▲ 0.46 (5.49%)
THCCL 69.58 Increased By ▲ 0.24 (0.35%)
TPLP 11.31 Increased By ▲ 1.03 (10.02%)
TREET 24.51 Increased By ▲ 0.31 (1.28%)
TRG 71.70 Increased By ▲ 2.16 (3.11%)
WAVES 11.50 Increased By ▲ 0.47 (4.26%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)

imageKARACHI: Routine life and business activities have been badly affected in the city because of unscheduled and prolonged power load shedding.

Several areas of the city face 10-12 hours long power failures.

The Karachi Electric Supply Company (KESC) had alerted citizens about the inevitable increase in the duration of load shedding in the coming week across all residential and commercial localities of the city which may go as high as 14 hours a day.

Underlining major reasons behind this unpleasant but unavoidable step, KESC said that despite repeated requests, the Government has not taken action to release the power utility's outstanding dues of Rs71 billion.

KESC stated that the liquidity crisis has made it impossible for the utility to purchase furnace oil to run its generating units. The limited gas supply has already limited its capacity to run the gas-fired power plants.

Copyright INP (Independent News Pakistan), 2013

Comments

Comments are closed for this article.