AIRLINK 73.00 Decreased By ▼ -2.16 (-2.87%)
BOP 5.35 Decreased By ▼ -0.10 (-1.83%)
CNERGY 4.31 Decreased By ▼ -0.08 (-1.82%)
DFML 28.55 Increased By ▲ 0.91 (3.29%)
DGKC 74.29 Increased By ▲ 2.29 (3.18%)
FCCL 20.35 Increased By ▲ 0.06 (0.3%)
FFBL 30.90 Decreased By ▼ -0.15 (-0.48%)
FFL 10.06 Increased By ▲ 0.09 (0.9%)
GGL 10.39 Increased By ▲ 0.12 (1.17%)
HBL 115.97 Increased By ▲ 0.97 (0.84%)
HUBC 132.20 Increased By ▲ 0.75 (0.57%)
HUMNL 6.68 Decreased By ▼ -0.19 (-2.77%)
KEL 4.03 Decreased By ▼ -0.17 (-4.05%)
KOSM 4.60 Decreased By ▼ -0.17 (-3.56%)
MLCF 38.54 Increased By ▲ 1.46 (3.94%)
OGDC 133.85 Decreased By ▼ -1.60 (-1.18%)
PAEL 23.83 Increased By ▲ 0.43 (1.84%)
PIAA 27.13 Decreased By ▼ -0.18 (-0.66%)
PIBTL 6.76 Increased By ▲ 0.16 (2.42%)
PPL 112.80 Decreased By ▼ -0.36 (-0.32%)
PRL 28.16 Decreased By ▼ -0.59 (-2.05%)
PTC 14.89 Decreased By ▼ -0.61 (-3.94%)
SEARL 56.42 Decreased By ▼ -0.91 (-1.59%)
SNGP 65.80 Decreased By ▼ -1.19 (-1.78%)
SSGC 11.01 Decreased By ▼ -0.16 (-1.43%)
TELE 9.02 Decreased By ▼ -0.12 (-1.31%)
TPLP 11.90 Decreased By ▼ -0.15 (-1.24%)
TRG 69.10 Decreased By ▼ -1.29 (-1.83%)
UNITY 23.71 Increased By ▲ 0.06 (0.25%)
WTL 1.33 Decreased By ▼ -0.01 (-0.75%)
BR100 7,434 Decreased By -20.9 (-0.28%)
BR30 24,206 Decreased By -44.4 (-0.18%)
KSE100 71,359 Decreased By -74.1 (-0.1%)
KSE30 23,567 Increased By 0.5 (0%)
Top News

Renewable power projects: SBP enhances capacity limit

RECORDER REPORT KARACHI: The State Bank of Pakistan (SBP) has enhanced the capacity limit of all renewable power proj
Published July 31, 2012

SBP2 400RECORDER REPORT

KARACHI: The State Bank of Pakistan (SBP) has enhanced the capacity limit of all renewable power projects from 10MW to 20MW for financing under the ‘Scheme for Financing Power Plants Using Renewable Energy.’

Banks/Development Finance Institutions (DFIs) can consider financing requests of the sponsors, who intend to set up Power Projects up to a maximum capacity of 20MW, using all types of renewable energy sources eligible under the Scheme, says IH&SMEFD Circular Letter No.11, issued to the Presidents/CEOs of all banks/DFIs on Monday.

The maximum financing limit to a single renewable power project under the Scheme has also been fixed at Rs 3 billion to accommodate larger number of borrowers. However, banks/DFIs may continue to provide financing facilities as per their credit policies over and above the maximum limit from their own sources subject to adherence to the Prudential Regulations, the Circular Letter added.

SBP has taken these steps to promote power plants using Renewable Energy in the country after receipt of feedback from the Alternative Energy Development Board (AEDB).

Comments

Comments are closed.