AIRLINK 78.39 Increased By ▲ 5.39 (7.38%)
BOP 5.34 Decreased By ▼ -0.01 (-0.19%)
CNERGY 4.33 Increased By ▲ 0.02 (0.46%)
DFML 30.87 Increased By ▲ 2.32 (8.13%)
DGKC 78.51 Increased By ▲ 4.22 (5.68%)
FCCL 20.58 Increased By ▲ 0.23 (1.13%)
FFBL 32.30 Increased By ▲ 1.40 (4.53%)
FFL 10.22 Increased By ▲ 0.16 (1.59%)
GGL 10.29 Decreased By ▼ -0.10 (-0.96%)
HBL 118.50 Increased By ▲ 2.53 (2.18%)
HUBC 135.10 Increased By ▲ 2.90 (2.19%)
HUMNL 6.87 Increased By ▲ 0.19 (2.84%)
KEL 4.17 Increased By ▲ 0.14 (3.47%)
KOSM 4.73 Increased By ▲ 0.13 (2.83%)
MLCF 38.67 Increased By ▲ 0.13 (0.34%)
OGDC 134.85 Increased By ▲ 1.00 (0.75%)
PAEL 23.40 Decreased By ▼ -0.43 (-1.8%)
PIAA 26.64 Decreased By ▼ -0.49 (-1.81%)
PIBTL 7.02 Increased By ▲ 0.26 (3.85%)
PPL 113.45 Increased By ▲ 0.65 (0.58%)
PRL 27.73 Decreased By ▼ -0.43 (-1.53%)
PTC 14.60 Decreased By ▼ -0.29 (-1.95%)
SEARL 56.50 Increased By ▲ 0.08 (0.14%)
SNGP 66.30 Increased By ▲ 0.50 (0.76%)
SSGC 10.94 Decreased By ▼ -0.07 (-0.64%)
TELE 9.15 Increased By ▲ 0.13 (1.44%)
TPLP 11.67 Decreased By ▼ -0.23 (-1.93%)
TRG 71.43 Increased By ▲ 2.33 (3.37%)
UNITY 24.51 Increased By ▲ 0.80 (3.37%)
WTL 1.33 No Change ▼ 0.00 (0%)
BR100 7,493 Increased By 58.6 (0.79%)
BR30 24,558 Increased By 338.4 (1.4%)
KSE100 72,052 Increased By 692.5 (0.97%)
KSE30 23,808 Increased By 241 (1.02%)
Top News

Renewable power projects: SBP enhances capacity limit

RECORDER REPORT KARACHI: The State Bank of Pakistan (SBP) has enhanced the capacity limit of all renewable power proj
Published July 31, 2012

SBP2 400RECORDER REPORT

KARACHI: The State Bank of Pakistan (SBP) has enhanced the capacity limit of all renewable power projects from 10MW to 20MW for financing under the ‘Scheme for Financing Power Plants Using Renewable Energy.’

Banks/Development Finance Institutions (DFIs) can consider financing requests of the sponsors, who intend to set up Power Projects up to a maximum capacity of 20MW, using all types of renewable energy sources eligible under the Scheme, says IH&SMEFD Circular Letter No.11, issued to the Presidents/CEOs of all banks/DFIs on Monday.

The maximum financing limit to a single renewable power project under the Scheme has also been fixed at Rs 3 billion to accommodate larger number of borrowers. However, banks/DFIs may continue to provide financing facilities as per their credit policies over and above the maximum limit from their own sources subject to adherence to the Prudential Regulations, the Circular Letter added.

SBP has taken these steps to promote power plants using Renewable Energy in the country after receipt of feedback from the Alternative Energy Development Board (AEDB).

Comments

Comments are closed.