AIRLINK 65.20 Decreased By ▼ -0.70 (-1.06%)
BOP 5.57 Decreased By ▼ -0.12 (-2.11%)
CNERGY 4.56 Decreased By ▼ -0.09 (-1.94%)
DFML 24.52 Increased By ▲ 1.67 (7.31%)
DGKC 69.96 Decreased By ▼ -0.74 (-1.05%)
FCCL 20.30 Decreased By ▼ -0.05 (-0.25%)
FFBL 29.11 No Change ▼ 0.00 (0%)
FFL 9.83 Decreased By ▼ -0.10 (-1.01%)
GGL 10.01 Decreased By ▼ -0.07 (-0.69%)
HBL 114.25 Decreased By ▼ -1.00 (-0.87%)
HUBC 129.10 Decreased By ▼ -0.40 (-0.31%)
HUMNL 6.71 Increased By ▲ 0.01 (0.15%)
KEL 4.44 Increased By ▲ 0.06 (1.37%)
KOSM 4.89 Decreased By ▼ -0.13 (-2.59%)
MLCF 37.00 Increased By ▲ 0.04 (0.11%)
OGDC 132.30 Increased By ▲ 1.10 (0.84%)
PAEL 22.54 Increased By ▲ 0.06 (0.27%)
PIAA 25.89 Decreased By ▼ -0.41 (-1.56%)
PIBTL 6.60 Increased By ▲ 0.07 (1.07%)
PPL 112.85 Increased By ▲ 0.73 (0.65%)
PRL 29.41 Increased By ▲ 1.02 (3.59%)
PTC 15.24 Decreased By ▼ -0.87 (-5.4%)
SEARL 57.03 Decreased By ▼ -1.26 (-2.16%)
SNGP 66.45 Increased By ▲ 0.76 (1.16%)
SSGC 10.98 Decreased By ▼ -0.04 (-0.36%)
TELE 8.80 Decreased By ▼ -0.14 (-1.57%)
TPLP 11.70 Increased By ▲ 0.17 (1.47%)
TRG 68.62 Decreased By ▼ -0.62 (-0.9%)
UNITY 23.40 Decreased By ▼ -0.55 (-2.3%)
WTL 1.38 Increased By ▲ 0.03 (2.22%)
BR100 7,295 Decreased By -9.1 (-0.12%)
BR30 23,854 Decreased By -96 (-0.4%)
KSE100 70,290 Decreased By -43.2 (-0.06%)
KSE30 23,171 Increased By 50.4 (0.22%)

imageISLAMABAD: Secretary Water and Power Younas Dhaga has said that coal fueled 1320 MW power project in Sahiwal would start producing energy by the end of 2017.

Talking to a private news channel, he said this was one of the mega energy projects which would be conducive in resolving energy crisis in the country.

He said the present government was setting new traditions by completing mega development projects speedily. On his visit to Sahiwal Prime Minister Muhammad Nawaz Sharif also appreciated the pace of ongoing work on the Project, he added.

He informed the coal fueled power project was being constructed near Qadirabad on 1001 acre land from which 35% work has been completed so far.

"The deadline of the project is December 25, 2017 and Chief Minister Shahbaz Sharif is committed to complete the project in stipulated period."

To a question he said that nothing can be fixed without fixing energy crisis and improving law and order situation and PML-N government was serious in this regard.

He said duration of load shedding has decreased to great extent during last years.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.