BR100 Increased By (0.99%)
BR30 Increased By (1.17%)
KSE100 Increased By (0.81%)
KSE30 Increased By (0.77%)
BECO 5.68 Increased By ▲ 0.09 (1.61%)
BML 64.84 Increased By ▲ 3.81 (6.24%)
BOP 33.60 Increased By ▲ 0.35 (1.05%)
CNERGY 8.24 Increased By ▲ 0.19 (2.36%)
DCL 11.35 Increased By ▲ 0.05 (0.44%)
FCCL 52.91 Decreased By ▼ -0.02 (-0.04%)
FCSC 5.52 Increased By ▲ 0.18 (3.37%)
FFL 17.80 Increased By ▲ 0.19 (1.08%)
FNEL 1.30 Decreased By ▼ -0.01 (-0.76%)
HUMNL 11.24 Increased By ▲ 0.12 (1.08%)
KEL 7.97 Increased By ▲ 0.08 (1.01%)
KOSM 5.44 Increased By ▲ 0.11 (2.06%)
MLCF 86.01 Increased By ▲ 0.66 (0.77%)
NBP 185.00 Increased By ▲ 3.71 (2.05%)
PACE 12.02 Increased By ▲ 0.49 (4.25%)
PAEL 40.21 Increased By ▲ 0.80 (2.03%)
PIAHCLA 25.73 Increased By ▲ 0.10 (0.39%)
PIBTL 17.32 Increased By ▲ 0.17 (0.99%)
PPL 225.30 Increased By ▲ 0.48 (0.21%)
PRL 34.38 Increased By ▲ 0.20 (0.59%)
PTC 65.46 Increased By ▲ 0.38 (0.58%)
SEARL 90.51 Increased By ▲ 0.91 (1.02%)
SSGC 26.76 Increased By ▲ 0.45 (1.71%)
TELE 8.96 Increased By ▲ 0.58 (6.92%)
THCCL 69.44 Increased By ▲ 0.10 (0.14%)
TPLP 11.31 Increased By ▲ 1.03 (10.02%)
TREET 24.55 Increased By ▲ 0.35 (1.45%)
TRG 71.67 Increased By ▲ 2.13 (3.06%)
WAVES 11.45 Increased By ▲ 0.42 (3.81%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)

ISLAMABAD: More than 30 alternate energy projects including wind and solar are in pipeline which would yield over 1500 MW power for the national grid by next year.

Since coming to power, present coalition government has taken a numerous steps to create an enabling environment for investment in Renewable Energy projects and now private sector investors have shown keenness to invest in this sector.

Giving details, an official at Alternate Development Energy Board (AEDB) on Tuesday said the wind projects which are in advanced stages of implementation would produce 556 MW.

These are 50 MW of Fauji Fertilizer Construction at the cost of $ 133.56 million, Zorlu Enerji Pak of 56 MW at the cost of $ 143.60, Three Gorges Construction of 50 MW at the cost of $ 134.75, Foundation-1 of 50 MW at the cost of $ 128.69 million, Foundation-2 of 50 MW at the cost of $ 128.70 million, Lucky Energy of 50 MW at the cost of $ 132.53 million, Sapphire Power of 50 MW at the cost of $ 128.87 million, Tenaga of 50 MW at the cost of $ 129.67 million, Generasi Power of 50 MW at the cost of $ 132.56 million, Master Energy 50 MW at the cost of $ 133.68 million and Gul Ahmed 50 MW at the cost of $ 132.87 million.

He said the projects which are providing electricity to the grid are six MW Wind (Zorlu Energy), 7 MW Biogas project by Shakarjang Sugar Mills, and 27 MW plant at Al-moiz Sugar Mills in D.I.Khan.

The official said AEDB had successfully completed a Rural Electrification Project under which 3000 Solar Home Systems were provided in 49 villages of district Tharparker, Sindh.

He said the new projects from biomas to energy are also in advance stages and would produce more than 60 MW energy for the national grid and help control loadshedding.

He said NEPRA has also issued generation license to 14 companies to produce more than 200 MW energy.

Moreover, the official while giving details about solar projects, said during the present government Parliamentarian Sponsored Village Electrification Programme (PSVEP) was launched under which 119 Solar Home Systems have been provided to 34 villages of Deh Tiko Baran District Jamshoro, Sindh and 200 Solar Home Systems in 06 Villages of Karak, District Khuzdar, Balochistan.

The systems are operational and the users are satisfied as 29 new schemes under this programme have been prepared for implementation, he added.

Regarding micro hydro power projects, the official said with the assistance of Global Environment Facility (GEF), a micro hydro project titles "Productive use of Renewable Energy" has been launched in Chitral, Gilgit and Skardu where more than 90 units of Micro Hydro power are being installed.

Copyright APP (Associated Press of Pakistan), 2012

Comments

Comments are closed for this article.