BR100 Increased By (0.99%)
BR30 Increased By (1.17%)
KSE100 Increased By (0.81%)
KSE30 Increased By (0.77%)
BECO 5.68 Increased By ▲ 0.09 (1.61%)
BML 64.84 Increased By ▲ 3.81 (6.24%)
BOP 33.60 Increased By ▲ 0.35 (1.05%)
CNERGY 8.24 Increased By ▲ 0.19 (2.36%)
DCL 11.35 Increased By ▲ 0.05 (0.44%)
FCCL 52.91 Decreased By ▼ -0.02 (-0.04%)
FCSC 5.52 Increased By ▲ 0.18 (3.37%)
FFL 17.80 Increased By ▲ 0.19 (1.08%)
FNEL 1.30 Decreased By ▼ -0.01 (-0.76%)
HUMNL 11.24 Increased By ▲ 0.12 (1.08%)
KEL 7.97 Increased By ▲ 0.08 (1.01%)
KOSM 5.44 Increased By ▲ 0.11 (2.06%)
MLCF 86.01 Increased By ▲ 0.66 (0.77%)
NBP 185.00 Increased By ▲ 3.71 (2.05%)
PACE 12.02 Increased By ▲ 0.49 (4.25%)
PAEL 40.21 Increased By ▲ 0.80 (2.03%)
PIAHCLA 25.73 Increased By ▲ 0.10 (0.39%)
PIBTL 17.32 Increased By ▲ 0.17 (0.99%)
PPL 225.30 Increased By ▲ 0.48 (0.21%)
PRL 34.38 Increased By ▲ 0.20 (0.59%)
PTC 65.46 Increased By ▲ 0.38 (0.58%)
SEARL 90.51 Increased By ▲ 0.91 (1.02%)
SSGC 26.76 Increased By ▲ 0.45 (1.71%)
TELE 8.96 Increased By ▲ 0.58 (6.92%)
THCCL 69.44 Increased By ▲ 0.10 (0.14%)
TPLP 11.31 Increased By ▲ 1.03 (10.02%)
TREET 24.55 Increased By ▲ 0.35 (1.45%)
TRG 71.67 Increased By ▲ 2.13 (3.06%)
WAVES 11.45 Increased By ▲ 0.42 (3.81%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)

The Economic Coordination Committee (ECC) of the Cabinet has decided to constitute a committee on discontinuation of power subsidy for industrial sector and payment of industrial subsidy package claims.
A meeting of the ECC presided over by Prime Minister Shahid Khaqan Abbasi was also said to have convened the first meeting of the panel today (Friday). The meeting chaired by the Prime Minister will analyze impacts and sustainability of the package. The ECC also decided to allow Sui Southern Gas Company Limited (SSGCL) to reallocate Rs14.8 billion from RLNG-II pipeline project to LPG air mix projects for their speedy completion and to ensure uninterrupted supply of gas to household consumers and industry etc.
The ECC also directed the SSGCL to expand setting up of air mix plants in every district of the country. The meeting also approved a proposal for grant of four years extension in Kandra Development and Production Lease.
The decision was taken after taking into account various impediments, which have hindered the production of recoverable reserves from Kandra gas field and setting up of 120MW power plant by M/s Kandra Power Company Ltd (a subsidiary of M/s Pakistan Exploration (Pvt) Ltd).
On a proposal of Ministry of Industries and Production, seeking approval of one-time grant to Pakistan Machine Tool Factory (PMTF) for payment of dues owed to its retired employees, the ECC approved a grant of Rs300 million as the first installment.

Copyright Business Recorder, 2018

Comments

Comments are closed for this article.