BR100 Increased By (1.24%)
BR30 Increased By (1.65%)
KSE100 Increased By (1.01%)
KSE30 Increased By (1.02%)
BECO 5.77 Increased By ▲ 0.18 (3.22%)
BML 62.77 Increased By ▲ 1.74 (2.85%)
BOP 33.72 Increased By ▲ 0.47 (1.41%)
CNERGY 8.18 Increased By ▲ 0.13 (1.61%)
DCL 11.50 Increased By ▲ 0.20 (1.77%)
FCCL 53.50 Increased By ▲ 0.57 (1.08%)
FCSC 5.52 Increased By ▲ 0.18 (3.37%)
FFL 17.86 Increased By ▲ 0.25 (1.42%)
FNEL 1.31 No Change ▼ 0.00 (0%)
HUMNL 11.15 Increased By ▲ 0.03 (0.27%)
KEL 8.00 Increased By ▲ 0.11 (1.39%)
KOSM 5.48 Increased By ▲ 0.15 (2.81%)
MLCF 86.20 Increased By ▲ 0.85 (1%)
NBP 185.11 Increased By ▲ 3.82 (2.11%)
PACE 12.39 Increased By ▲ 0.86 (7.46%)
PAEL 40.56 Increased By ▲ 1.15 (2.92%)
PIAHCLA 25.90 Increased By ▲ 0.27 (1.05%)
PIBTL 17.55 Increased By ▲ 0.40 (2.33%)
PPL 226.75 Increased By ▲ 1.93 (0.86%)
PRL 34.52 Increased By ▲ 0.34 (0.99%)
PTC 65.94 Increased By ▲ 0.86 (1.32%)
SEARL 90.61 Increased By ▲ 1.01 (1.13%)
SSGC 26.80 Increased By ▲ 0.49 (1.86%)
TELE 8.59 Increased By ▲ 0.21 (2.51%)
THCCL 71.30 Increased By ▲ 1.96 (2.83%)
TPLP 11.31 Increased By ▲ 1.03 (10.02%)
TREET 24.52 Increased By ▲ 0.32 (1.32%)
TRG 72.23 Increased By ▲ 2.69 (3.87%)
WAVES 11.52 Increased By ▲ 0.49 (4.44%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)

ISLAMABAD: National Highway Authority (NHA) is planning to construct 205 kilometer Bajour (Khar)-Jandola-Zhob Road.

After approval of its PC-I, procurement of the project will be initiated .The road is part of proposed 933 mm long Federally Administered Tribal Area (FATA) Highway and feasibility study is initiated on the alignment proposed by the FATA Secretariat.

The project will be part of FATA Highway.

The project envisages the construction of two-lane highway as per NHA specifications.

The road will also connect the China Pakistan Economic Corridor at Zhob via DI Khan-Kuchlak Highway (N-50).   The project is included in Public Sector Development Programme (PSDP) 2017-18 with an allocated amount

Rs 250 million for conducting the feasibility study and design.The construction period of project will be 24 months.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed for this article.