AIRLINK 62.48 Increased By ▲ 2.05 (3.39%)
BOP 5.36 Increased By ▲ 0.01 (0.19%)
CNERGY 4.58 Decreased By ▼ -0.02 (-0.43%)
DFML 15.50 Increased By ▲ 0.66 (4.45%)
DGKC 66.40 Increased By ▲ 1.60 (2.47%)
FCCL 17.59 Increased By ▲ 0.73 (4.33%)
FFBL 27.70 Increased By ▲ 2.95 (11.92%)
FFL 9.27 Increased By ▲ 0.21 (2.32%)
GGL 10.06 Increased By ▲ 0.10 (1%)
HBL 105.70 Increased By ▲ 1.49 (1.43%)
HUBC 122.30 Increased By ▲ 4.78 (4.07%)
HUMNL 6.60 Increased By ▲ 0.06 (0.92%)
KEL 4.50 Decreased By ▼ -0.05 (-1.1%)
KOSM 4.48 Decreased By ▼ -0.09 (-1.97%)
MLCF 36.20 Increased By ▲ 0.79 (2.23%)
OGDC 122.92 Increased By ▲ 0.53 (0.43%)
PAEL 23.00 Increased By ▲ 1.09 (4.97%)
PIAA 29.34 Increased By ▲ 2.05 (7.51%)
PIBTL 5.80 Decreased By ▼ -0.14 (-2.36%)
PPL 107.50 Increased By ▲ 0.13 (0.12%)
PRL 27.25 Increased By ▲ 0.74 (2.79%)
PTC 18.07 Increased By ▲ 1.97 (12.24%)
SEARL 53.00 Decreased By ▼ -0.63 (-1.17%)
SNGP 63.21 Increased By ▲ 2.01 (3.28%)
SSGC 10.80 Increased By ▲ 0.05 (0.47%)
TELE 9.20 Increased By ▲ 0.71 (8.36%)
TPLP 11.44 Increased By ▲ 0.86 (8.13%)
TRG 70.86 Increased By ▲ 0.95 (1.36%)
UNITY 23.62 Increased By ▲ 0.11 (0.47%)
WTL 1.28 No Change ▼ 0.00 (0%)
BR100 6,944 Increased By 65.8 (0.96%)
BR30 22,827 Increased By 258.6 (1.15%)
KSE100 67,142 Increased By 594.3 (0.89%)
KSE30 22,090 Increased By 175.1 (0.8%)

imagePESHAWAR: The Peshawar Electric Supply Company (PESCO)'s Disconnection and Recovery Teams have disconnected power supply of several defaulters' consumers for non-payment of outstanding amount and arrears in Nowshera cantonment division and recovered pending dues from different circles.

According to PESCO spokesman here Friday, the recovery campaign was in full swing through out the province and Rs 200,000 have been recovered from defaulters in Nowshera cantonment division. Similarly, Rs 17 lac from 30 defaulters have been recovered from Kohat division while a cases were sent to the concerned police stations for lodging FIRs against 37 consumers involved in power theft.

Similarly, the Disconnection Teams of Mathani sub division have recovered Rs 1.5 lac from defaulters while power supply of consumers was disconnected from 100 KVA transformer on charges of using direct hooks and power stealing.

In Kohat Division from 26 defaulter consumers Rs 18 lac have been recovered while power supply of several consumers were disconnected from three distribution transformers due to non payment of Rs 3 lac outstanding dues.

Also, power supply was disconnected of the 73 defaulters of 11 kv Achini feeder from three 200 KVA distribution transformers due to non payment of dues of Rs 8 lac. The recovery teams in Hangu have also recovered 3 lac rupees from 78 defaulter consumers and expended circle of recovery.

The defaulters have been strongly warned to deposit their dues at earliest, otherwise their electricity will not be restored and strict legal action would be taken against them.

Comments

Comments are closed.