AIRLINK 62.48 Increased By ▲ 2.05 (3.39%)
BOP 5.36 Increased By ▲ 0.01 (0.19%)
CNERGY 4.58 Decreased By ▼ -0.02 (-0.43%)
DFML 15.50 Increased By ▲ 0.66 (4.45%)
DGKC 66.40 Increased By ▲ 1.60 (2.47%)
FCCL 17.59 Increased By ▲ 0.73 (4.33%)
FFBL 27.70 Increased By ▲ 2.95 (11.92%)
FFL 9.27 Increased By ▲ 0.21 (2.32%)
GGL 10.06 Increased By ▲ 0.10 (1%)
HBL 105.70 Increased By ▲ 1.49 (1.43%)
HUBC 122.30 Increased By ▲ 4.78 (4.07%)
HUMNL 6.60 Increased By ▲ 0.06 (0.92%)
KEL 4.50 Decreased By ▼ -0.05 (-1.1%)
KOSM 4.48 Decreased By ▼ -0.09 (-1.97%)
MLCF 36.20 Increased By ▲ 0.79 (2.23%)
OGDC 122.92 Increased By ▲ 0.53 (0.43%)
PAEL 23.00 Increased By ▲ 1.09 (4.97%)
PIAA 29.34 Increased By ▲ 2.05 (7.51%)
PIBTL 5.80 Decreased By ▼ -0.14 (-2.36%)
PPL 107.50 Increased By ▲ 0.13 (0.12%)
PRL 27.25 Increased By ▲ 0.74 (2.79%)
PTC 18.07 Increased By ▲ 1.97 (12.24%)
SEARL 53.00 Decreased By ▼ -0.63 (-1.17%)
SNGP 63.21 Increased By ▲ 2.01 (3.28%)
SSGC 10.80 Increased By ▲ 0.05 (0.47%)
TELE 9.20 Increased By ▲ 0.71 (8.36%)
TPLP 11.44 Increased By ▲ 0.86 (8.13%)
TRG 70.86 Increased By ▲ 0.95 (1.36%)
UNITY 23.62 Increased By ▲ 0.11 (0.47%)
WTL 1.28 No Change ▼ 0.00 (0%)
BR100 6,944 Increased By 65.8 (0.96%)
BR30 22,827 Increased By 258.6 (1.15%)
KSE100 67,142 Increased By 594.3 (0.89%)
KSE30 22,090 Increased By 175.1 (0.8%)

high tension wireKARACHI: Improved fuel supply to power generation units, end to electricity theft and regular billing could help end load-shedding in the metropolis, said KESC COO Tabish Gohar here on Wednesday.

"We need uninterrupted and smooth supply of gas and furnace oil to our power generation units," he said while addressing a press conference.

He said there was no deliberate attempt by the management of KESC to resort to load-shedding and resented power riots and attacks on KESC offices.

"Some hidden elements are involved in various acts of violence against KESC," he alleged without pointing out finger on any group.

He was of the view that differences between the management and employees should not cause inconvenience to the customers as issues could be solved through negotiations.

Despite being over staffed, last year 6,500 employees were regularised and a Human Resource Committee was being set up to look into all aspects pertaining to the employees.

Tabish Gohar said that billing system has been improved to a great extent.

About various measures taken by KESC to improve power production, he said a bio-fuel gas project has already been launched in Landhi area and a 700 MW plant will also start production later this year.

"During the last two and a half years, 400 MW power supply has been added into the system," he added.

 

Copyright APP (Associated Press of Pakistan), 2011 

 

Comments

Comments are closed.